SEAC Energy

CENTRAL ENERGY PLANT (CEP) INNOVATION

SEAC Energy delivers fully funded Central Energy Plant (CEP) systems to support chilled and hot water production for HVAC and building services. Each CEP is engineered for performance, scalability, and energy integration, with optional capabilities for domestic hot water and swimming pool pre-heating using residual HVAC energy.

Our CEP solutions include both air- and water-cooled systems, sized modularly for redundancy, sequencing, and optimal load efficiency.

Key Technological Elements:

  • Modular air- and water-cooled chillers with redundancy sequencing
  • Optional integration for domestic hot water and pool pre-heating
  • High-capacity thermal storage tanks for inertia and load balancing
  • Integration with SCADA/BAS platforms for plant status and fault reporting
  • Electrically integrated switchboards with embedded sub-metering
  • Seamless interface with Building Management Systems (BMS)

All large-scale CEPs are equipped with a Central Plant Management System (CPMS) that enables:

  • Remote diagnostics and control
  • Automated performance tracking
  • Fault detection and status reporting
  • Energy optimisation through demand forecasting and plant scheduling

For compact installations, CPMS functionality may be embedded within the unit itself, while retaining BMS compatibility.

Systemic Outcomes:

  • Reduced refrigerant line lengths and rooftop congestion
  • Lower operating emissions through optimised energy cycles
  • Contributions toward NABERS and Green Star credits and compliance
  • Full technical and operational responsibility assumed by SEAC, with:
    • No capital cost
    • No operating or maintenance burden
    • Transparent performance reporting and compliance visibility

Where a funded CEP is not preferred, Ellis Air Group offers DX (split) systems as a conventional mechanical solution.

  •  
  •  

Contact Us
Website: www.seacenergy.com.au
Phone: 1300 236 906
Company Name: Ellis Air Connect T/A SEAC Energy